New Castle, DE

Clean Earth of

New Castle

94 Pyles Lane
New Castle, DE 19720
T 302.427.6633  |  F 302.427.6634


Clean Earth of New Castle, Inc. (CENC) operates a thermal treatment facility that can handle a wide variety of volatile and semi-volatile contaminants including MGP wastes and non-hazardous coal tar contaminated soils and aggregates.

 

1newcastle.jpg

2newcastle.jpg

Facility Type
Non-hazardous soil treatment, processing and recycling facility

Treatment Platform
Thermal desorption and physical treatment

Permit
Resource Recovery Permit DESW #95/07

Capacity
360,000 tons per year

Acceptable Materials
Non-hazardous soil, MGP waste, drummed soil

At other facilities in our network, we also handle these materials:

Contaminated soil
Hazardous liquid (bulk/non-bulk)
Waste water  (bulk/non-bulk)
Pharmaceuticals
Non-hazardous material

Asbestos
Drums
Solvents
Flammable solids
Industrial waste

Oily waste
PCBs
Aerosols
Drill Cuttings
Lab packs

Hours of Operation
8:00 a.m. to 5:00 p.m., Monday – Friday
Extended weekly hours and Saturday/Sunday
hours by arrangement

Services
Project management, transportation, soil testing, manifesting, loading, soil treatment and processing

Facility Access
Convenient access from Interstate Routes 95, 295 and 495

Processed Materials
Topsoil supplement, construction material, road sub-base, landfill cover, asphalt plant feed, fill material

Clean Earth recycles or beneficially reuses  approximately 98% of the material it processes.