Clean Earth of
New Castle
94 Pyles Lane New Castle, DE 19720 T 302.427.6633 | F 302.427.6634
Clean Earth of New Castle, Inc. (CENC) operates a thermal treatment facility that can handle a wide variety of volatile and semi-volatile contaminants including MGP wastes and non-hazardous coal tar contaminated soils and aggregates.


|
Facility Type Non-hazardous soil treatment, processing and recycling facility
Treatment Platform Thermal desorption and physical treatment
Permit Resource Recovery Permit DESW #95/07
Capacity 360,000 tons per year
Acceptable Materials Non-hazardous soil, MGP waste, drummed soil
At other facilities in our network, we also handle these materials:
|
Contaminated soil Hazardous liquid (bulk/non-bulk) Waste water (bulk/non-bulk) Pharmaceuticals Non-hazardous material
|
Asbestos Drums Solvents Flammable solids Industrial waste
|
Oily waste PCBs Aerosols Drill Cuttings Lab packs
|
Hours of Operation 8:00 a.m. to 5:00 p.m., Monday – Friday Extended weekly hours and Saturday/Sunday hours by arrangement
Services Project management, transportation, soil testing, manifesting, loading, soil treatment and processing
Facility Access Convenient access from Interstate Routes 95, 295 and 495
Processed Materials Topsoil supplement, construction material, road sub-base, landfill cover, asphalt plant feed, fill material
Clean Earth recycles or beneficially reuses approximately 98% of the material it processes.
|