New Castle, DE
94 Pyles Lane - New Castle, DE 19720
T 302.427.6633 | F 302.427.6634
Clean Earth of New Castle, Inc. (CENC) operates a thermal treatment facility that can handle a wide variety of volatile and semi-volatile contaminants including MGP wastes and non-hazardous coal tar contaminated soils and aggregates.


Facility Type
Non-hazardous soil treatment, processing and recycling facility
Treatment Platform
Thermal desorption and physical treatment
Permit
Resource Recovery Permit #SW02A16
Capacity
360,000 tons per year
Acceptable Materials
Non-hazardous soil, MGP waste, drummed soil
At other facilities in our network, we also handle these materials:
- Contaminated soil
- Hazardous liquid (bulk/non-bulk)
- Waste water (bulk/non-bulk)
- Pharmaceuticals
- Non-hazardous material
- Asbestos
- Drums
- Solvents
- Flammable solids
- Industrial waste
- Oily waste
- PCBs
- Aerosols
- Drill cuttings
- Lab packs
Hours of Operation
8:00 a.m. to 5:00 p.m., Monday - Friday Extended weekly hours and Saturday/Sunday hours by arrangement
Services
Project management, transportation, soil testing, manifesting, loading, soil treatment and processing
Facility Access
Convenient access from Interstate Routes 95, 295 and 495
Processed Materials
Topsoil supplement, construction material, road sub-base, landfill cover, asphalt plant feed, fill material
Clean Earth recycles or beneficially reuses approximately 98% of the material it processes.
Clean Earth of New Castle has been reviewed by CHWMEG, Inc. Click here for details.

